The following steps are to be taken which calibrating:
- Adjust zero of the Tx'r.
- Static pressure test : Give equal pressure on both sides of the transmitter. Zero should not shift. If it is shifting carry out static alignment.
- Vacuum test : Apply equal vacuum to both the sides. The zero should not shift.
- Calibration Procedure:
- Give 20 psi air or 24V dc supply to the transmitter.
- Vent the L.P. side to atmosphere.
- Connect output of the Instrument to a standard test gauge ot Multimeter and adjust zero.
- Apply required pressure to high pressure side of the transmitter and adjust the span.
- Adjust zero again if necessary.
No comments:
Post a Comment